Date: 22-11-17  Time: 17:47 PM

Author Topic: White Creek Railroad: 7.5 Gauge Train Operations Video I  (Read 314 times)

0 Members and 1 Guest are viewing this topic.

Offline Alan Krum

  • Major Contributor
  • *****
  • Posts: 297
  • Outside the Box
    • Alan Krum
Published on Jul 23, 2015 by TheSteamChannel
Climb aboard and enjoy the sights and sounds from the 2015 White Creek Spring Open Meet. 1 1/2" trains littered the railroad's 5 mile mainline during the meet and the weather was perfect for railroading. Construction began on the railroad in 1994 and it currently rests over approximately 100 acres in the heart of Michigan. The railroad touts over 285 switches and six trestle bridges which range in length from 60 feet to 320 feet. This is the first in a four video series from the White Creek Spring Open Meet. Thanks for watching The Steam Channel!
'Like' us on Facebook:
http://www.Facebook.com/TheSteamChannel
Visit us on Google+:
https://www.google.com/+TheSteamChannel
https://youtu.be/mU0AZfDG4ac
Getting interested in any Technology is the cornerstone of Life today.